![]() |
| Lad Burgin |
Monday, May 2, 2016
Skipper
Sunday, May 1, 2016
First Officer
Saturday, April 30, 2016
Donna Austin (crew)
Monday, April 18, 2016
April 16 - OYRA Lightship Race
We berthed at Berkeley Yacht Club on Friday
night and met everyone at around 730AM at the boat. It took about 50
mins to get from BYC to the St Francis Yacht Club for the start. The Bay
was glassy and calm at 940 when we motored into position. Slack Tide
was 9AM
with Max Ebb at 104PM at the Gate. Our start saw about 2 kts of current
which helped us get out of the Gate at the start. There were many
retirements.
The race sequence start was
postponed by 40 minutes (940 -> 1020) and the committee also
shortened the sequence by rescheduling Foxtrot fleet so we were caught
down tide from the start line with 1 minute to go. We started about 1
min late as a consequence and motored to get into position. We started
with Golf fleet and immediately flew spinnaker with some difficulty with
getting the sheet and guy rigged correctly. Winds were light and we
struggled to fill the spinnaker We floated out with the ebb, crossing
into the no-go zone off Point Anita. On the way we passed Adrenaline who
was anchored in the no-go zone. Lad mentioned that we could protest,
but ultimately Adrenaline withdrew and we didn't protest.
The winds filled in by the gate to around 8-10 out of 040. Winds at the Lightship buoy were only about 2-4Kts at 10AM. By
the time we made it out to the Lightship Buoy in the early afternoon,
winds were closer to 15 kts. The wind shifted to predominantly Westerly
out of 235.
We put in about 4-5 tacks before
laying a course for the mark, rounded to Port. We rounded, but decided
not to fly spinnaker at that point. We saw a lot of spinnakers on the
way back from the lightship buoy, and we ran back under Jib and Main and
eventually flew the spinnaker as we approached the gate. The wind died
before we reached Pt. Bonita, but we rode the 2 kt flood back into the
gate until the wind built again. Coming in under the Gate, we were on a
hot angle to reach the finish line and hit 9 kts+ of boat speed before a
rushed douse. Shadowside held the spinnaker well in 15kts of air, but
we were eventually rounded up before dousing. We finished at 20:25:30. It took about 90 mins to reach the Berkeley Marina and we Berthed at 22:10.
Here is a list of fix it items:
- -> Spinnaker sheets need to be replaced (not long enough)
- -> AIS Power and Transmit seems to be interfering with the radios and causing radio buzz/white noise.
- -> We need a way to cover up the windlass as it repeatedly caught on the spinnaker gear, particularly the downhaul. (Foreguy)
- -> The Spinnaker Shackle with the Blue ball needs to be lubricated to allow it to spin
- -> Steering Wheel Autopilot U-Bolts need to be filed down. (Sharp edges)
- -> Spinnaker Pole needs a way to trip from the jaws
- -> Boom Brake needs to be lubricated and adjusted. Not easy to slack and tighten.
Eric
Tuesday, April 5, 2016
The Countdown to Pacific Cup 2016 is picking up.
On "Shadowside" we are pulling the last details together, getting ready to hop aboard and set out for Kaneohe Bay. Did I mention that there are about 10,000 "last details".
There are a couple more chances to practice before the big event:
- April 16 - OYRA Lightship Race
- May 21 - OYRA Duxship Race
- June 11 - OYRA OYRA Farallones Race
- June 25 - OYRA One Way to Half Moon Bay (Maybe)
Our start will be on Monday, July 11th, somewhere around noon, at the St. Francis Yacht Club on the Marina Green in San Francisco. From there it's about 2100 nautical miles to the finish line just outside Kaneohe Bay on the island of Oahu in Hawaii.
After the finish it's time to switch gears from hard sailing to hard partying:
- Wednesday, July 27 - Luau at Kaneohe YC
- Thursday, July 28 - Mt. Gay Rum Party at KYC
- Friday, July 29 - Awards Ceremony at KYC
Subscribe to:
Posts (Atom)



